For contractors & renovators

The job runs for weeks. The money arrives in pieces.

Kitchens, bathrooms, basements, decks, small additions. The work spans weeks, the cash arrives as a deposit then instalments, and what quietly costs you money is a change nobody wrote down. Built for that end of construction — not a fifty-unit build with a site office.

Illustration of a bathroom mid-renovation in cutaway, with a bare stud wall, a tiled wall, a ladder and materials

Where small jobs go wrong

Before you start

Materials bought out of your own pocket

Set a deposit as a percentage or a flat amount on the quote, so the tile and the vanity are not financed by you for three weeks.

Halfway through

Paid in pieces, tracked in your head

Record each payment as it lands — cheque, e-Transfer, cash or card — and the outstanding balance keeps itself current.

At the end

“That wasn't what we agreed”

Photos of every stage sit on the job with dates attached. Most disagreements end the moment somebody scrolls back to what was behind the wall.

A quote with the deposit built in

On a fourteen-thousand-dollar bathroom, the deposit is not an awkward conversation you have after the fact — it is a line on the quote they are already saying yes to. Set it as a percentage or a fixed figure and it appears with the total.

Break the job into stages the homeowner recognises: demolition, rough-in, waterproofing, fixtures, finishing. It reads as a plan rather than a number, and it makes the later conversation about a change far easier because everyone can see what was in scope.

Sales tax comes from the province you set, so the HST line is right without checking.

Ellisdon Renovations Guelph, ON
QUOTE #5127
Valid 30 days
For M. & T. Okafor — 41 Kortright Rd W, GuelphSentViewedAccepted
Demolition & disposal of existing bathroom$1,250.00
Rough-in plumbing relocation, vanity & shower$2,400.00
Waterproofing & tile setting, 60 sq ft$3,150.00
Supply & install vanity, toilet, shower valve$2,780.00
Electrical — pot lights, fan, GFCI (licensed sub)$1,450.00
Painting & finish carpentry$980.00
Project management & site protection$650.00
Subtotal$12,660.00
HST (13%)$1,645.80
Total$14,305.80
Deposit due to start (25%)$3,576.45
ChequeInterac e-TransferCard Record each payment as it lands

An illustration of a TradePilot quote, not a real customer. Ontario HST shown at 13% — TradePilot applies the rate for the province you set.

An invoice on a phone showing amount paid and the balance still outstanding

Know what is still owed without doing sums

Renovation money rarely arrives in one piece. A deposit, something at rough-in, the balance at the end — and often a cheque handed over on site with no paperwork attached to it.

Record each payment against the invoice with the method it came in as, and the outstanding balance is always current. When somebody asks what is left on the job, the answer is on your phone rather than in a notebook in the truck.

Deposit
Rough-in
Final
$3,576$5,722$5,007

Jobs that run longer than a day

A bathroom is not a two-hour call. Jobs can span a date range on the calendar, so a three-week reno occupies the days it actually occupies instead of pretending to be a single appointment. Assign your crew across it at no extra cost — the price does not move whether it is you and a labourer or six people.

Multi-day jobs across a date range
Deposits by percentage or fixed amount
Partial payments by cheque, e-Transfer, cash or card
Outstanding balance always current
Dated photos on every job
HST applied from your province
Automatic payment reminders
Your whole crew at one price
Public page for job enquiries

One gap worth knowing: there's no change-order feature. When scope changes, send a second quote for the extra work — agreed in writing and separately invoiceable, but not a dedicated change-order document. If that's central to how you work, it matters.

Questions contractors ask

Can I take a deposit before starting?
Yes. Set it on the quote or invoice as a percentage or a fixed amount and it shows alongside the total, so it is agreed up front rather than asked for later.
Can I record a cheque handed to me on site?
Yes. Payments are recorded against the invoice with the method — cheque, e-Transfer, cash or card — and the balance updates itself.
Do you handle change orders?
Not as a dedicated document. Most people send a second quote for the additional work, which keeps it in writing and lets you invoice it separately. If formal change orders matter to you, this is a real gap.
Can a job span three weeks on the calendar?
Yes — jobs can run across a date range rather than sitting on one day.
Is this for big commercial construction?
No. There is no job costing, no submittals, no gantt scheduling and no accounting integration. This is for small residential and light commercial work run by a small crew.
Does the price change as I take on more people?
No. One flat price covers the whole crew.

Try it on your next reno.

30 days free. No card, no setup call, no sales pitch.

Start free for 30 days

TradePilot on Android

TradePilot installs straight from your browser — the same full app, nothing to download from a store.

  1. 1Open app.gettradepilot.net in Chrome on your Android phone and sign in (or start your free trial).
  2. 2Tap the menu, then Add to Home screen (on some phones it says Install app).
  3. 3Tap Install — TradePilot runs full-screen from your home screen and updates itself automatically.
Start free — 30 days

Prefer Google Play? We're working on bringing TradePilot there too.

Book a 15-min demo

Leave your name and number and we'll call to set up a time that works around your jobs.

Something went wrong — please try again, or email support@gettradepilot.net.

Got it — talk soon.

We'll call you within one business day to set up your demo. No prep needed.